Morning Litho status 7/25
Gary J Sosa
gsosa at stanford.edu
Wed Jul 25 07:59:54 PDT 2012
Good morning All...
Here is the morning Litho status report.
Please check back in Coral for the latest tool updates and current equipment status.
Thanks... The Litho Team
Photolithography Quick Snapshot
Wednesday, July 25, 2012
New Issues
No new issues reported overnight
Old Issues- Ongoing
ASML Stepper -Problem: Process restriction - Do not expose any wafers with thick resist, 3.0um
and above(220-3 and 220-7 resists) until further notice. The purge/extraction hood has been removed
for repair by ASML.
YES Oven- Intermittent pumpdown problem. Fails to achieve setpoint. Replacement of valve
body and mech pump did not solve. Adjusted N2 purge and chamber door position.
continued Replaced door gasket on 7/24. Testing in progress.
KSCoat -Shutdown: Robot vacuum and wafer pick up failure at load-station. Troubleshot
vacuuum problem and replaced vacuum solenoid for endeffector. Re-taught loadstation Z
height positions for 4"wafers. ASML will test. Still need to teach 3",5",6" and 8"
positions
Resolved Issues
Photolithography Area Status
Wednesday, July 25, 2012
General Information / Lab Activities
Mahnaz - LOA( 5/31 - 8/1 )
ASML Stepper : Purge/extraction hood install delayed. Purge hood sent back to
Veldhoven to replace broken windows.
Exposure Tools
Status
Comments
Priority
ASML Stepper
PROBLEM
No thick resist processing
2
EVAlign
PROBLEM
Intermittent joystick issue
4
EVAlign2
UP
EVG-Imprint
PROBLEM
Tool idle til needed
Karl Suss 1
UP
.
Karl Suss 2
UP
Manual Coaters
Status
EVGSpraycoat
UP
Headway
UP
Laurel
UP
Coaters
Process Status
SVGCoat
3612 Process
Up
220-3 Process
Up
220-7 Process
Up
SVGCoat2
3612 Process
Up
3617 Process
Up
955-0.7 Process
Up
Developers
Status
SVGDEV
UP
SVGDEV2
UP
Ovens / Hotplates
Status
BLUEM
UP
Blue M 90 C.
UP
Blue M 110 C
UP
Blue M 150 C
UP
Fusion
UP
UV-Cure
UP
White-Oven
UP
YES Vapor Prime
PROBLEM
Intermittent vacuum problem
1
Hotplates-
Laurel-left
UP
Laurel- right
UP
Wenesco- Left
UP
90 Deg C
UP
115 Deg C
UP
Wenesco- Right
UP
Metrology/Inspection
Status
AFM
UP
Alpha-Step 500
UP
Flexus Stresstest
UP
Nanospec 1-Etch
UP
Nanospec 2-Litho
UP
Prometrix
UP
P2 Profiler
UP
Rudolph Ellipsometer
UP
Surfscan 4500
UP
Woolam
UP
Zygo
UP
CD burner works
Microscpoes-
#1 Leica/
UP
#2 Ergolux/Drytek2
UP
#3 Olympus/Litho
UP
#4 Nikon Optiphot/Litho
UP
#5 Nikon/Litho
UP
#6 Leitz/Bosch
UP
#7 Leitz/Diffusion
UP
#8 Olympus/Litho
UP
#9Olympus/Litho
UP
Miscellaneous
Status
EVBond
PROBLEM
Clamps are stiff
3
KSBonder
UP
KSCoat
PROBLEM
Robot teaching
Litho SRD
UP
Mask Cleaner
UP
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/litho/attachments/20120725/06e42e98/attachment.html>
More information about the litho
mailing list