Photolithography Quick Snapshot
Monday, November 05, 2012
New Issues
Laurel R- Problem: User "kcbalram" reports a broken wafer in process bowl.
SVGCoat- Problem: User "popomoo" reports 3612 resist not dispensing
Old Issues- Ongoing
ASML Stepper- Purge hood removed again due to contamination issue and damage to
wafer table optics. The following process restrictions are in effect: 1- No thick resist processing
(3.0 microns and above) until further notice. Possible re-installation this week but depends
on ASML's available resources.
YES Oven- Intermittent pumpdown problem. Fails to achieve setpoint. Performed a leakcheck
on 9/28). Identified a leak in the chamber( rear/lower right corner). Investigating options.
KSCoat -Problem: Robot wafer pickup at load station. OK to process 4" wafers. Still need
to check 3", 5" 6" and 8" wafer sized and re-teach as needed.
KS Coat- Problem: User "lindaohara" reports a coolant water flow problem. Investigated
and found the water pump to be bad. Motor is OK. Water pump replaced on 11/2. Good water
flow. Cannot reach setpoint of 21 degrees C.. Suspect bad chiller. Will investigate further.
Resolved Issues
Photolithography Area Status
Monday, November 05, 2012
General Information / Lab Activities
Mahnaz - Vacation(10/29 - 11/13)
EVG Bonder- Changing pressure plate from Quartz to Steel today(11/5)
Exposure Tools
Status
Comments
Priority
ASML Stepper
PROBLEM
No thick resist processing
5
EVAlign
PROBLEM
Intermittent joystick problem
EVAlign2
UP
EVG-Imprint
PROBLEM
Tool idle til needed
Karl Suss 1
UP
Karl Suss 2
UP
Manual Coaters
Status
EVGSpraycoat
UP
Headway
UP
Laurel
PROBLEM
Broken wafer
1
Coaters
Process Status
SVGCoat
3612 Process
Problem
Not dispensing
2
220-3 Process
Up
220-7 Process
Up
SVGCoat2
3612 Process
Up
3617 Process
Up
955-0.7 Process
Up
Developers
Status
SVGDEV
UP
SVGDEV2
UP
Ovens / Hotplates
Status
BLUEM
UP
Blue M 90 C.
UP
Blue M 110 C
UP
Blue M 150 C
UP
Fusion
UP
UV-Cure
UP
White-Oven
UP
YES Vapor Prime
PROBLEM
Intermittent vacuum problem
3
Hotplates-
Laurel-left
UP
Laurel- right
UP
Wenesco- Left
UP
90 Deg C
UP
115 Deg C
UP
Wenesco- Right
UP
Metrology/Inspection
Status
AFM
UP
Alpha-Step 500
UP
Flexus Stresstest
UP
Nanospec 1-Etch
UP
Nanospec 2-Litho
UP
Prometrix
UP
P2 Profiler
UP
Rudolph Ellipsometer
UP
Surfscan 4500
UP
Woolam
UP
Zygo
UP
Microscpoes-
#1 Leica/
UP
#2 Ergolux/Drytek2
UP
#3 Olympus/Litho
UP
#4 Nikon Optiphot/Litho
UP
#5 Nikon/Litho
UP
#6 Leitz/Bosch
UP
#7 Leitz/Diffusion
UP
#8 Olympus/Litho
UP
#9Olympus/Litho
UP
Miscellaneous
Status
EVBond
PROBLEM
Clamps are stiff
4
KSBonder
UP
KSCoat
PROBLEM
Coolant flow problem
Litho SRD
UP
Mask Cleaner
UP
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/litho/attachments/20121105/6abe5271/attachment.html>
More information about the litho
mailing list