Good morning All...
Here is the morning Litho status report.
Please check back in Coral for the latest tool updates and current equipment status .
Thanks.... The Litho Team
Photolithography Quick Snapshot
Monday, October 22, 2012
New Issues
None-
Old Issues- Ongoing
ASML Stepper- Purge hood removed again due to contamination issue and damage to
wafer table optics. The following process restrictions are in effect: 1- No thick resist processing
(3.0 microns and above) until further notice. Possible re-installation within the next 2 weeks
but dependant on ASML's available resources
YES Oven- Intermittent pumpdown problem. Fails to achieve setpoint. Performed a leakcheck
on 9/28). Identified a leak in the chamber( rear/lower right corner). Investigating options.
KSCoat -Problem: Robot wafer pickup at load station. OK to process 4" wafers. Still need
to check 3", 5" 6" and 8" wafer sized and re-teach as needed.
EVG Spraycoater- User "jackson" reports that the system needs a new registration code.
Request submitted. Will get the keycode today as per EVG F/S manager.
Resolved Issues
SVG Coat1- Problem: User "bchui" reports that 220-7 resist is not dispensing. Reset the
pump controller.
ASML Stepper- Problem: Edge sensor on pre-aligner having issues detecting the edges
on Glass/Quartz wafers. ASML F/S adjusted the edge sensor and verified with several samples
EVG Spraycoater- User "jackson" reports that the system needs a new registration code.
Request submitted. Key-code entered to activate software. System tested OK.
Photolithography Area Status
Monday, October 22, 2012
General Information / Lab Activities
Exposure Tools
Status
Comments
Priority
ASML Stepper
PROBLEM
No thick resist processing
2
EVAlign
PROBLEM
Intermittent joystick problem
3
EVAlign2
UP
EVG-Imprint
PROBLEM
Tool idle til needed
Karl Suss 1
UP
Karl Suss 2
UP
Manual Coaters
Status
EVGSpraycoat
UP
Headway
UP
Laurel
UP
Coaters
Process Status
SVGCoat
3612 Process
Up
220-3 Process
Up
220-7 Process
Up
SVGCoat2
3612 Process
Up
3617 Process
Up
955-0.7 Process
Up
Developers
Status
SVGDEV
UP
SVGDEV2
UP
Ovens / Hotplates
Status
BLUEM
UP
Blue M 90 C.
UP
Blue M 110 C
UP
Blue M 150 C
UP
Fusion
UP
UV-Cure
UP
White-Oven
UP
YES Vapor Prime
PROBLEM
Intermittent vacuum problem
1
Hotplates-
Laurel-left
UP
Laurel- right
UP
Wenesco- Left
UP
90 Deg C
UP
115 Deg C
UP
Wenesco- Right
UP
Metrology/Inspection
Status
AFM
UP
Alpha-Step 500
UP
Flexus Stresstest
UP
Nanospec 1-Etch
UP
Nanospec 2-Litho
UP
Prometrix
UP
P2 Profiler
UP
Rudolph Ellipsometer
UP
Surfscan 4500
UP
Woolam
UP
Zygo
UP
Microscpoes-
#1 Leica/
UP
#2 Ergolux/Drytek2
UP
#3 Olympus/Litho
UP
#4 Nikon Optiphot/Litho
UP
#5 Nikon/Litho
UP
#6 Leitz/Bosch
UP
#7 Leitz/Diffusion
UP
#8 Olympus/Litho
UP
#9Olympus/Litho
UP
Miscellaneous
Status
EVBond
PROBLEM
Clamps are stiff
4
KSBonder
UP
KSCoat
PROBLEM
Robot teaching
Litho SRD
UP
Mask Cleaner
UP
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/litho/attachments/20121022/5d8990c0/attachment.html>
More information about the litho
mailing list