Good morning All...
Here is the morning Litho status report.
Please check back in Coral for the latest tool updates and current equipment status.
Thanks... The Litho Team
Photolithography Quick Snapshot
Tuesday, October 30, 2012
New Issues
None
Old Issues- Ongoing
ASML Stepper- Purge hood removed again due to contamination issue and damage to
wafer table optics. The following process restrictions are in effect: 1- No thick resist processing
(3.0 microns and above) until further notice. Timing of re-instalation still not decided yet,
and is dependant on ASML's available resources
YES Oven- Intermittent pumpdown problem. Fails to achieve setpoint. Performed a leakcheck
on 9/28). Identified a leak in the chamber( rear/lower right corner). Investigating options.
KSCoat -Problem: Robot wafer pickup at load station. OK to process 4" wafers. Still need
to check 3", 5" 6" and 8" wafer sized and re-teach as needed.
KS Coat- Problem: User "lindaohara" reports a coolant water flow problem. Investigated
and found the water pump to be bad. Motor is OK. Just head unit needs replacement. Advised
ASML with pricing and vendor information.
Resolved Issues
Photolithography Area Status
Tuesday, October 30, 2012
General Information / Lab Activities
Uli- Vacation(10/24 - 10/31)
Mahnaz - Vacation(10/29 - 11/13)
Scheduled electrical panel work- Zygo, Woolam, Prometrix and Leica Scope powered down
until work is completed. Expected time to complete is 9:00am
Exposure Tools
Status
Comments
Priority
ASML Stepper
PROBLEM
No thick resist processing
2
EVAlign
PROBLEM
Intermittent joystick problem
4
EVAlign2
UP
EVG-Imprint
PROBLEM
Tool idle til needed
Karl Suss 1
UP
Karl Suss 2
UP
Manual Coaters
Status
EVGSpraycoat
UP
Headway
UP
Laurel
UP
Coaters
Process Status
SVGCoat
3612 Process
Up
220-3 Process
Up
220-7 Process
Up
SVGCoat2
3612 Process
Up
3617 Process
Up
955-0.7 Process
Up
Developers
Status
SVGDEV
UP
SVGDEV2
UP
Ovens / Hotplates
Status
BLUEM
UP
Blue M 90 C.
UP
Blue M 110 C
UP
Blue M 150 C
UP
Fusion
UP
UV-Cure
UP
White-Oven
UP
YES Vapor Prime
PROBLEM
Intermittent vacuum problem
1
Hotplates-
Laurel-left
UP
Laurel- right
UP
Wenesco- Left
UP
90 Deg C
UP
115 Deg C
UP
Wenesco- Right
UP
Metrology/Inspection
Status
AFM
UP
Alpha-Step 500
UP
Flexus Stresstest
UP
Nanospec 1-Etch
UP
Nanospec 2-Litho
UP
Prometrix
DOWN
Scheduled electrical work
P2 Profiler
UP
Rudolph Ellipsometer
UP
Surfscan 4500
UP
Woolam
DOWN
Scheduled electrical work
Zygo
DOWN
Scheduled electrical work
Microscpoes-
#1 Leica/
DOWN
Scheduled electrical work
#2 Ergolux/Drytek2
UP
#3 Olympus/Litho
UP
#4 Nikon Optiphot/Litho
UP
#5 Nikon/Litho
UP
#6 Leitz/Bosch
UP
#7 Leitz/Diffusion
UP
#8 Olympus/Litho
UP
#9Olympus/Litho
UP
Miscellaneous
Status
EVBond
PROBLEM
Clamps are stiff
3
KSBonder
UP
KSCoat
PROBLEM
Coolant flow problem
5
Litho SRD
UP
Mask Cleaner
UP
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/litho/attachments/20121030/dda62f5e/attachment.html>
More information about the litho
mailing list