From sjo at snf.stanford.edu Wed Feb 16 19:52:33 2005 From: sjo at snf.stanford.edu (sjo at snf.stanford.edu) Date: Wed, 16 Feb 2005 19:52:33 -0800 Subject: Problem metalica SNF 2005-02-16 19:52:33: Target Tester not Working + no Multimeter Message-ID: The target tester isn't working, and there was no multimeter to manually test for shorts. I figured I'd take my chances and live with it. However, after the pumpdown I had an arcing error on target A. I would have saved a lot of time if I could have tested for this beforehand. I'd like to see the multimeter return. From rfasch at snf.stanford.edu Fri Feb 18 07:03:20 2005 From: rfasch at snf.stanford.edu (rfasch at snf.stanford.edu) Date: Fri, 18 Feb 2005 07:03:20 -0800 Subject: Comment metalica SNF 2005-02-18 07:03:19: target tester not working Message-ID: -Rainer From sdogbe at snf.stanford.edu Mon Feb 21 18:41:39 2005 From: sdogbe at snf.stanford.edu (sdogbe at snf.stanford.edu) Date: Mon, 21 Feb 2005 18:41:39 -0800 Subject: Problem metalica SNF 2005-02-21 18:41:38: Shorting on Target B Message-ID: Shorting problem observed on target B after testing. The metal case housing the target was changed for taget B. The shorting problem disappeared. From jhaydon at snf.stanford.edu Thu Feb 24 08:55:48 2005 From: jhaydon at snf.stanford.edu (jhaydon at snf.stanford.edu) Date: Thu, 24 Feb 2005 08:55:48 -0800 Subject: Problem metalica SNF 2005-02-16 19:52:33: Target Tester not Working + no Multimeter Message-ID: target tester repaired From jhaydon at snf.stanford.edu Thu Feb 24 08:55:56 2005 From: jhaydon at snf.stanford.edu (jhaydon at snf.stanford.edu) Date: Thu, 24 Feb 2005 08:55:56 -0800 Subject: Comment metalica SNF 2005-02-18 07:03:19: target tester not working Message-ID: