From popomoo at snf.stanford.edu Sat May 2 10:55:33 2009 From: popomoo at snf.stanford.edu (popomoo at snf.stanford.edu) Date: Sat, 2 May 2009 10:55:33 -0700 Subject: Comment metalica SNF 2009-05-02 10:55:32: Swab stick Message-ID: There are only three sticks left... From rostam at snf.stanford.edu Tue May 5 00:09:46 2009 From: rostam at snf.stanford.edu (rostam at snf.stanford.edu) Date: Tue, 5 May 2009 00:09:46 -0700 Subject: Problem metalica SNF 2009-05-05 00:09:46: no swabs / no bag for Ti target Message-ID: From dtschoen at snf.stanford.edu Sun May 10 18:45:44 2009 From: dtschoen at snf.stanford.edu (dtschoen at snf.stanford.edu) Date: Sun, 10 May 2009 18:45:44 -0700 Subject: Problem metalica SNF 2009-05-10 18:45:43: TargetA Not OK After Deposition Attempt Message-ID: I was using TargetA to depostion Mo. Loading the chamber seemed normal, and the testing panel showed OK. After pumpdown, the testing panel still showed OK. After following the instructions I attempted to start a deposition, but the plasma wouldn't strike. I switched the panel back to test, and it showed Not OK. From jhaydon at snf.stanford.edu Tue May 12 10:24:05 2009 From: jhaydon at snf.stanford.edu (jhaydon at snf.stanford.edu) Date: Tue, 12 May 2009 10:24:05 -0700 Subject: Problem metalica SNF 2009-05-10 18:45:43: TargetA Not OK After Deposition Attempt Message-ID: probably a target problem From jhaydon at snf.stanford.edu Tue May 12 10:25:39 2009 From: jhaydon at snf.stanford.edu (jhaydon at snf.stanford.edu) Date: Tue, 12 May 2009 10:25:39 -0700 Subject: Problem metalica SNF 2009-05-05 00:09:46: no swabs / no bag for Ti target Message-ID: swab supply has been refilled From dtschoen at snf.stanford.edu Tue May 12 11:50:55 2009 From: dtschoen at snf.stanford.edu (dtschoen at snf.stanford.edu) Date: Tue, 12 May 2009 11:50:55 -0700 Subject: Problem metalica SNF 2009-05-12 11:50:55: Mo Cannot be Used Message-ID: I'm not sure why, perhaps the pucks are a little too thick, but neither Mo source can be loaed into either target without sending the test panel to "Not OK". From jperez at snf.stanford.edu Tue May 19 10:58:15 2009 From: jperez at snf.stanford.edu (jperez at snf.stanford.edu) Date: Tue, 19 May 2009 10:58:15 -0700 Subject: Comment metalica SNF 2009-05-02 10:55:32: Swab stick Message-ID: bag of swab sticks added. From jperez at snf.stanford.edu Tue May 19 10:59:26 2009 From: jperez at snf.stanford.edu (jperez at snf.stanford.edu) Date: Tue, 19 May 2009 10:59:26 -0700 Subject: Problem metalica SNF 2009-05-12 11:50:55: Mo Cannot be Used Message-ID: I have removed both Mo targets and have placed an order. Should be in soon. From jperez at snf.stanford.edu Tue May 19 11:00:52 2009 From: jperez at snf.stanford.edu (jperez at snf.stanford.edu) Date: Tue, 19 May 2009 11:00:52 -0700 Subject: Problem metalica SNF 2009-04-13 08:15:52: Switched to Dry pump Message-ID: It seems that the new dry pump and operating procedures are working fine (no complaints). GOOD! From jperez at snf.stanford.edu Tue May 19 11:01:46 2009 From: jperez at snf.stanford.edu (jperez at snf.stanford.edu) Date: Tue, 19 May 2009 11:01:46 -0700 Subject: Comment metalica SNF 2009-05-19 11:01:46: Molybdenum on order Message-ID: From jperez at snf.stanford.edu Thu May 21 13:18:48 2009 From: jperez at snf.stanford.edu (jperez at snf.stanford.edu) Date: Thu, 21 May 2009 13:18:48 -0700 Subject: Comment metalica SNF 2009-05-19 11:01:46: Molybdenum on order Message-ID: Mo target in metal box. From nppatil at snf.stanford.edu Thu May 28 14:18:39 2009 From: nppatil at snf.stanford.edu (nppatil at snf.stanford.edu) Date: Thu, 28 May 2009 14:18:39 -0700 Subject: Problem metalica SNF 2009-05-28 14:18:38: Roughing Pump Message-ID: Roughing pump not working. From jhaydon at snf.stanford.edu Thu May 28 16:24:09 2009 From: jhaydon at snf.stanford.edu (jhaydon at snf.stanford.edu) Date: Thu, 28 May 2009 16:24:09 -0700 Subject: Problem metalica SNF 2009-05-28 14:18:38: Roughing Pump Message-ID: replaced fuse in controller.