From grupp at snf.stanford.edu Wed Jul 17 02:13:37 2002 From: grupp at snf.stanford.edu (grupp at snf.stanford.edu) Date: Jul 17, 2002 2:13:37 AM Subject: Problem mrc 2002-07-17 02:13:36: No cooling water! Message-ID: cooling water lines are empty. I could really use the coolth. Thanks, Dan Grupp From mdickey at snf.stanford.edu Wed Jul 17 07:31:37 2002 From: mdickey at snf.stanford.edu (mdickey at snf.stanford.edu) Date: Jul 17, 2002 7:31:37 AM Subject: Shutdown mrc 2002-07-17 07:31:36: Pump check Message-ID: shutting down the system to add oil to the mechanical pump From booth at snf.stanford.edu Wed Jul 17 12:53:23 2002 From: booth at snf.stanford.edu (booth at snf.stanford.edu) Date: Jul 17, 2002 12:53:23 PM Subject: Shutdown mrc 2002-07-17 12:53:23: Electrode chiller has failed Message-ID: Chiller will be sent out for repair. From booth at snf.stanford.edu Wed Jul 17 12:54:05 2002 From: booth at snf.stanford.edu (booth at snf.stanford.edu) Date: Jul 17, 2002 12:54:05 PM Subject: Problem mrc 2002-07-17 02:13:36: No cooling water! Message-ID: chiller must be repaired. Changed to Shutdown. From booth at snf.stanford.edu Wed Jul 17 12:54:40 2002 From: booth at snf.stanford.edu (booth at snf.stanford.edu) Date: Jul 17, 2002 12:54:40 PM Subject: Shutdown mrc 2002-07-17 07:31:36: Pump check Message-ID: demister changed & fomblin 14/6 added to vane pump. From booth at snf.stanford.edu Wed Jul 17 03:54:06 2002 From: booth at snf.stanford.edu (booth at snf.stanford.edu) Date: Jul 17, 2002 3:54:06 PM Subject: Shutdown mrc 2002-07-17 12:53:23: Electrode chiller has failed Message-ID: allowing Dan Grupp to use system for short etch without cooling. From booth at snf.stanford.edu Wed Jul 17 03:54:44 2002 From: booth at snf.stanford.edu (booth at snf.stanford.edu) Date: Jul 17, 2002 3:54:44 PM Subject: Problem mrc 2002-07-17 15:54:43: No electrode cooling Message-ID: Chiller has failed, sent out for repair. From grupp at snf.stanford.edu Wed Jul 17 06:51:57 2002 From: grupp at snf.stanford.edu (grupp at snf.stanford.edu) Date: Jul 17, 2002 6:51:57 PM Subject: Shutdown mrc 2002-07-17 18:51:56: no cooling water Message-ID: From mcvittie at snf.stanford.edu Fri Jul 19 05:08:56 2002 From: mcvittie at snf.stanford.edu (mcvittie at snf.stanford.edu) Date: Jul 19, 2002 5:08:56 PM Subject: Shutdown mrc 2002-07-17 18:51:56: no cooling water Message-ID: Cooling water is still not repair. Putting etcher on line for short test. Jim From booth at snf.stanford.edu Mon Jul 22 09:27:36 2002 From: booth at snf.stanford.edu (booth at snf.stanford.edu) Date: Jul 22, 2002 9:27:36 AM Subject: Shutdown mrc 2002-07-22 09:27:35: Chiller out for repair Message-ID: From rcrane at snf.stanford.edu Mon Jul 22 11:59:01 2002 From: rcrane at snf.stanford.edu (rcrane at snf.stanford.edu) Date: Jul 22, 2002 11:59:01 AM Subject: Shutdown mrc 2002-07-22 09:27:35: Chiller out for repair Message-ID: Up for testing without chiller From cbaxter at snf.stanford.edu Mon Jul 22 07:19:50 2002 From: cbaxter at snf.stanford.edu (cbaxter at snf.stanford.edu) Date: Jul 22, 2002 7:19:50 PM Subject: Problem mrc 2002-07-17 15:54:43: No electrode cooling Message-ID: installed chiller that came off from the stsetch