Comment mrc SNF 2009-08-25 17:29:19: MRC

calarrudo at calarrudo at
Tue Aug 25 17:29:20 PDT 2009

After the small leak was found and fixed in the SF6 line above the 
shutoff I etched 500A of Pt  with an Etch Time of 5:30.  The MRC is now etching correctly for my wafers.

More information about the mrc-pcs mailing list