Problem mrc SNF 2011-08-08 08:15:50: roughing pump left on
calarrudo at snf.stanford.edu
calarrudo at snf.stanford.edu
Mon Aug 8 08:15:50 PDT 2011
The last user left the roughing pump on when system when tool when etch completed and tool left in standby condition.
More information about the mrc-pcs
mailing list