From gsosa at snf.stanford.edu Tue Apr 19 10:24:06 2011 From: gsosa at snf.stanford.edu (gsosa at snf.stanford.edu) Date: Tue, 19 Apr 2011 10:24:06 -0700 Subject: Shutdown p2 SNF 2011-04-19 10:24:05: Scheduled service 4/19 Message-ID: Scheduled service. Vendor as working on the wafer stage issue. From uli at snf.stanford.edu Wed Apr 20 17:06:14 2011 From: uli at snf.stanford.edu (uli at snf.stanford.edu) Date: Wed, 20 Apr 2011 17:06:14 -0700 Subject: Shutdown p2 SNF 2011-04-19 10:24:05: Scheduled service 4/19 Message-ID: P2 is back. Ran test wafer. System is ready to use. From uli at snf.stanford.edu Wed Apr 20 17:07:15 2011 From: uli at snf.stanford.edu (uli at snf.stanford.edu) Date: Wed, 20 Apr 2011 17:07:15 -0700 Subject: Problem p2 SNF 2010-10-05 15:33:15: Error -11 on Sample Unload Message-ID: Stage problem should be fixed.