From rcrane at snf.stanford.edu Mon Aug 6 17:29:41 2001 From: rcrane at snf.stanford.edu (Dick Crane) Date: Mon, 06 Aug 2001 17:29:41 -0700 Subject: Toxic gas tests complete Message-ID: <3B6F3675.B7C5D461@snf.stanford.edu> The toxic gas alarm system tests are now complete. All tools using toxic gases are back up with the following exceptions: tylanpoly tylanbpsg tylanSiGe tystar 1 EPI Silane MFC calibrations are still being completed. Tools should be up tomorrow. Thanks, Dick From latta at snf.stanford.edu Tue Aug 21 10:59:10 2001 From: latta at snf.stanford.edu (Nancy Latta) Date: Tue, 21 Aug 2001 10:59:10 -0700 Subject: Etcher reserved all tomorrow (8/22) Message-ID: <3B82A16E.310F419@snf.stanford.edu> Folks, I will be doing a contamination study on chamber A tomorrow which requires two (befroe and after) wet chamber cleans. I cannot have any other work go into chamber A during this series of tests. Please talk to me if you need to use the machine with any other chamber besides A. Thanks, Nancy From latta at snf.stanford.edu Wed Aug 22 16:38:06 2001 From: latta at snf.stanford.edu (Nancy Latta) Date: Wed, 22 Aug 2001 16:38:06 -0700 (PDT) Subject: Done! Message-ID: Folks, I am finished with the contamination tests on Chamber A. Thanks for your cooperation today. Nancy