From rcrane at snf.stanford.edu Mon Jul 30 16:19:01 2001 From: rcrane at snf.stanford.edu (Dick Crane) Date: Mon, 30 Jul 2001 16:19:01 -0700 Subject: Toxic gas shutdown Aug. 6 Message-ID: <3B65EB65.1A0E4C61@snf.stanford.edu> On Monday, August 6, 2001, from 0800 to 1600, the toxic gas distribution system will shut down to allow reprogramming and testing of the gas detection system as part of the fire alarm upgrade. The following tools will be affected: STSdep, EPI, PECVD, Plasmaquest, LAMpoly, P5000etch, AMTetcher, TylanSiGe, Tylanpoly, TylanBPSG, Tylannitride, and Tystar. The system will be tested during the day with occasional audio and strobe test alarms. Please disregard toxic (blue light) alarms from 0800 to 1600 on Monday, August 6. Thanks, Dick