Shutdown pquest SNF 2008-06-24 23:13:27: loading/unloading problem
eenriquez at snf.stanford.edu
eenriquez at snf.stanford.edu
Wed Jun 25 18:50:07 PDT 2008
Installed new lifter pin. Found the wafer clamp tensioner was binding. Realigned one of the clamp mounting post. Also replaced the backside helium oring seal.
Cleaned the gate valve and oring. Found several wafer pieces resting on the o-ring.
Ran O2 plasma. Leak rate = 16 mT/min. Will leak rate again tomorrow.