Comment pquest SNF 2009-05-13 18:17:39: Reassembly update

eenriquez at snf.stanford.edu eenriquez at snf.stanford.edu
Wed May 13 18:17:40 PDT 2009


Electrode has been installed and aligned.  Installed most of the dark space shielding and re-connected the helium cooling line.  Suggest pumping down the system to verify vacuum integrity before completing reassembly.