Shutdown pquest SNF 2010-03-16 14:03:00: wafer broken inside

chingmei at chingmei at
Tue Mar 16 14:03:01 PDT 2010

The wafer was broken when unloaded at the second round unknownly. The He flow kept up to 5sccm in both rounds. Sorry about the inconvenience.

More information about the pquest-pcs mailing list