Shutdown raith SNF 2004-08-16 16:04:09: major system malfunction

jwc at snf.stanford.edu jwc at snf.stanford.edu
Mon Aug 16 17:15:08 PDT 2004


For reasons unknown and unidentified...
It appears that we lost all vacuum and control funtion logic.
I reset the entire LEO Platform and cycled the mechanical pump power switches.  The system is now back up in yellow.
JWC