Problem raith SNF 2004-08-28 13:00:07: NO operations above 10 keV

jwc at snf.stanford.edu jwc at snf.stanford.edu
Sat Aug 28 13:00:08 PDT 2004


we wish to allow the FE-gun two weeks of conditioning before we resume regular operations.  This is to allow the FE-tip to condition itslef and run in properly.
System was tested repeatedly to 30 keV with no EHT trips or vacumm ouotgassing above normal levels
JWC 08282004:1256 hrs