Shutdown raith SNF 2005-01-07 10:51:32: EHT trip -- back to gun run up and conditioning.
jwc at snf.stanford.edu
jwc at snf.stanford.edu
Fri Jan 7 16:45:27 PST 2005
Previous message:
Shutdown raith SNF 2005-01-07 10:51:32: EHT trip -- back to gun run up and conditioning.
Next message:
Problem raith SNF 2005-01-07 16:46:36: NO operations above 15 kV acceleration voltage
Messages sorted by:
[ date ]
[ thread ]
[ subject ]
[ author ]
Previous message:
Shutdown raith SNF 2005-01-07 10:51:32: EHT trip -- back to gun run up and conditioning.
Next message:
Problem raith SNF 2005-01-07 16:46:36: NO operations above 15 kV acceleration voltage
Messages sorted by:
[ date ]
[ thread ]
[ subject ]
[ author ]
More information about the raith-pcs mailing list