From hansj at snf.stanford.edu Sat Feb 4 04:48:02 2006 From: hansj at snf.stanford.edu (hansj at snf.stanford.edu) Date: Sat, 4 Feb 2006 04:48:02 -0800 Subject: Problem raith SNF 2006-02-04 04:48:01: previous user unload incompletely Message-ID: load lock error From sanaka at snf.stanford.edu Sat Feb 4 10:14:08 2006 From: sanaka at snf.stanford.edu (sanaka at snf.stanford.edu) Date: Sat, 4 Feb 2006 10:14:08 -0800 Subject: Problem raith SNF 2006-02-04 10:14:08: Raith150 is stopping Message-ID: When I unload the sample of faron from the Raith150, the procedure stopped and PC says [Load/Unload was not complete]. The system is unavailable now and we need recovery. Kaoru Sanaka From lsmoore at stanford.edu Mon Feb 6 11:39:11 2006 From: lsmoore at stanford.edu (Lindsay Shannon Moore) Date: Mon, 6 Feb 2006 11:39:11 -0800 Subject: raith available 1-4 today Message-ID: <1139254751.43e7a5df797b7@webmail.stanford.edu> sample not ready. sorry. lindsay From jwc at snf.stanford.edu Tue Feb 7 10:15:36 2006 From: jwc at snf.stanford.edu (jwc at snf.stanford.edu) Date: Tue, 7 Feb 2006 10:15:36 -0800 Subject: Problem raith SNF 2006-02-04 04:48:01: previous user unload incompletely Message-ID: Cleared -- resolved early AM Saturday by phone support frmo JWC From jwc at snf.stanford.edu Tue Feb 7 10:17:29 2006 From: jwc at snf.stanford.edu (jwc at snf.stanford.edu) Date: Tue, 7 Feb 2006 10:17:29 -0800 Subject: Problem raith SNF 2006-02-04 10:14:08: Raith150 is stopping Message-ID: Note: Users should be carefuly to follow load lock procedure and esp, to ensure that the cancel button is never selected on the Unable top pump loadlock error message. Always attempt to 'RETRY' to resume LL procedure. Also NEVER reset computer during a LL procedure you will trip the fatal load lock error. JWC From jwc at snf.stanford.edu Wed Feb 15 13:42:17 2006 From: jwc at snf.stanford.edu (jwc at snf.stanford.edu) Date: Wed, 15 Feb 2006 13:42:17 -0800 Subject: Shutdown raith SNF 2006-02-15 13:42:16: Zeiss Field Service performing adjustments Message-ID: System back on line about 2:30 PM jwc From jwc at snf.stanford.edu Wed Feb 15 16:24:19 2006 From: jwc at snf.stanford.edu (jwc at snf.stanford.edu) Date: Wed, 15 Feb 2006 16:24:19 -0800 Subject: Shutdown raith SNF 2006-02-15 13:42:16: Zeiss Field Service performing adjustments Message-ID: clear all adjustmenst completed