Comment raith SNF 2007-12-06 18:26:54: completed stage leveling test on 6 and 4 inch wafer on ESChuck

jwc at jwc at
Thu Dec 6 18:26:55 PST 2007

was able to level all but the 100 mm 4" wafer.
I will test another 4 inch wafer before shuit down before making any changes to the chuck adjustable kinetic mounts.
Nice beam today save parameters for 10 kv 20 um apt. onto system.