Problem raith SNF 2007-02-17 02:11:49: Raith150 Beam blank out of sync
sqliu at snf.stanford.edu
sqliu at snf.stanford.edu
Sat Feb 17 02:11:50 PST 2007
The Raith 150 beak blanking control was displaying the opposite of the beam status. Could not obtain a SEM signal for write field alignment (presumably b/c the beam was blanked?)
More information about the raith-pcs
mailing list