Problem raith SNF 2008-11-17 18:27:41: system under qualification

jwc at jwc at
Tue Nov 18 08:52:20 PST 2008

system [passed qualification with excellent stitching and resolution on the USH sample holder with leveling the piezo post.
wafer subnitted for metal deposition and lift off before adding level two structures to test overlay and stitching
happy happy, let the queue resume.

More information about the raith-pcs mailing list