Shutdown raith SNF 2009-11-10 14:32:54: Loss of X Motor control and Motor

jwc at snf.stanford.edu jwc at snf.stanford.edu
Tue Nov 10 14:32:55 PST 2009


For Unknown reason we have lost functionality and control of the X motor in the Laser Interferometer Stage.  A new motor was ordered late last evening from East Coast and it will arrive Wednesday morning.
I will need to calibrate and requalify the system in the afternoon before releasing the tool for Users.
Thank you for your understanding.
James




More information about the raith-pcs mailing list