Shutdown raith SNF 2012-10-11 13:02:34: I/O trip

jwc at snf.stanford.edu jwc at snf.stanford.edu
Sun Dec 23 09:15:07 PST 2012


water cooling shut down due to low level water in Hascres chiller.
checked for leaks and found none, possibly increased evaporation rate from basement ventilation changes...
resume pump and ebeam control package and am bringing FE-Gun back on line slowly.
Should be ready for users after 4:30 to 5 PM.
Call me if you have questions.
James