From rcrane at snf.stanford.edu Wed Jun 1 08:51:14 2005 From: rcrane at snf.stanford.edu (Dick Crane) Date: Wed, 01 Jun 2005 08:51:14 -0700 Subject: Column work delayed two weeks Message-ID: <429DD972.2070306@snf.stanford.edu> Raith users: The column replacement work scheduled for the week of June 6 has been delayed and is tentatively rescheduled for the week of June 20. I have removed the maintenance reservations from the week of June 6. Please feel free to sign up for this newly opened time. Thanks, Dick From hansj at stanford.edu Wed Jun 1 13:51:18 2005 From: hansj at stanford.edu (Shu-Jen Han) Date: Wed, 01 Jun 2005 13:51:18 -0700 Subject: res removed Fri. 9a-12p Message-ID: <6.0.1.1.2.20050601135037.04600540@hansj.pobox.stanford.edu> enjoy From ifushman at stanford.edu Thu Jun 2 21:32:35 2005 From: ifushman at stanford.edu (Ilya Fushman) Date: Thu, 2 Jun 2005 21:32:35 -0700 Subject: done early Message-ID: <1117773155.429fdd63d4908@webmail.stanford.edu> done early. arvind is next. -ilya From rissman at stanford.edu Fri Jun 3 11:54:13 2005 From: rissman at stanford.edu (Paul Rissman) Date: Fri, 03 Jun 2005 11:54:13 -0700 Subject: Fwd: MNE 2005 - Abstract Submission - Deadline Notice Message-ID: <5.1.1.5.2.20050603115350.01831bd8@rissman.pobox.stanford.edu> >X-Sieve: CMU Sieve 2.2 >Reply-To: >From: "Abstracts MNE 05" >To: >Subject: MNE 2005 - Abstract Submission - Deadline Notice >Date: Fri, 3 Jun 2005 20:09:04 +0200 >X-Mailer: Microsoft Outlook IMO, Build 9.0.2416 (9.0.2910.0) >Importance: Normal >X-Scanned-By: MIMEDefang 2.38 > >mne-2005_for_web.jpg > >The 31st International Conference on Micro- and Nano-Engineering will be >held in Vienna, Austria, 19 - 22 Sept 2005. > >Just a reminder that abstracts are due by >12 June 2005! > >Please submit your abstract on-line using the MNE 2005 website >www.mne05.org > >For complete abstract guidelines and conference information, please refer >also to our website. > >Hans Loeschner >MNE 2005 Program Chair >abstracts at mne05.org > >Please disregard this information if you already have submitted your >abstract(s). > -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: mne-2005_for_web.jpg Type: image/jpeg Size: 13535 bytes Desc: not available URL: From jwc at snf.stanford.edu Mon Jun 6 14:47:06 2005 From: jwc at snf.stanford.edu (James Conway) Date: Mon, 06 Jun 2005 14:47:06 -0700 Subject: Column work delayed two weeks RAITH system offline 10 AM Monday June 20 through afternoon June 24. In-Reply-To: <429DD972.2070306@snf.stanford.edu> References: <429DD972.2070306@snf.stanford.edu> Message-ID: <42A4C45A.6080305@snf.stanford.edu> Greetings Raith Users: The planned downtime to replace the RAITH 150 system SEM Column must be delayed for two weeks. The RAITH system will then be going offline to users 10 AM Monday June 20 through late afternoon Friday June 24. We may possibly be seeking standby operators for test exposures evening and overnight on Thursday June 23, 2005; but only if we can complete raith field service test before that time. Please see James Conway if you are interested in helping us qualify the system. Why the delay? RAITH GMBH and Zeiss SMT field service personnel working in Oberkocken, DE. were forced to delay the scheduled installation of the new SEM column on our RAITH Ebeam lithography system due to their want to fully characterize the replacement SEM column. It was discovered during initial testing that the Aperture Plate was aligned to the default LEO 1530 orientation and not to the standard RAITH 150 aperture orientation which is required by the RAITH system. This forces the people working on the system to break gun section vacuum, rotate the aperture plate, and perform an additional bakeout on the system. This is your notice that we will be taking the system off line from 10 AM Monday June 20 through late afternoon June 24, 2005. PCM test and Qualification runs will be conducted that Friday afternoon 13:00 - 18:00 hours. There is the opportunity to " Share the Ride" with me during these test. Raith and myself apologize for the change in the planned downtime, but this was unavoidable. Users are encouraged to make good use of this additional time remaining to complete your work if possible on the system. Thank you for your support! James W. Conway Dick Crane wrote: > Raith users: > > The column replacement work scheduled for the week of June 6 has been > delayed and is tentatively rescheduled for the week of June 20. I have > removed the maintenance reservations from the week of June 6. Please > feel free to sign up for this newly opened time. > > Thanks, > > Dick -------------- next part -------------- An HTML attachment was scrubbed... URL: From jwc at snf.stanford.edu Mon Jun 6 14:49:38 2005 From: jwc at snf.stanford.edu (James Conway) Date: Mon, 06 Jun 2005 14:49:38 -0700 Subject: Annoucement 2: RAITH system offline 10 AM Monday June 20 through afternoon June 24. In-Reply-To: <429DD972.2070306@snf.stanford.edu> References: <429DD972.2070306@snf.stanford.edu> Message-ID: <42A4C4F2.6080807@snf.stanford.edu> Greetings Raith Users: The planned downtime to replace the RAITH 150 system SEM Column must be delayed for two weeks. The RAITH system will be going offline to users 10 AM Monday June 20 through late afternoon Friday June 24. We may possibly be seeking standby operators for test exposures evening and overnight on Thursday June 23, 2005; but only if we can complete raith field service test before that time. Please see James Conway if you are interested in helping us qualify the system. Why the delay? RAITH GMBH and Zeiss SMT field service personnel working in Oberkocken, DE. were forced to delay the scheduled installation of the new SEM column on our RAITH Ebeam lithography system due to their want to fully characterize the replacement SEM column. It was discovered during initial testing that the Aperture Plate was aligned to the default LEO 1530 orientation and not to the standard RAITH 150 aperture orientation which is required by the RAITH system. This forces the people working on the system to break gun section vacuum, rotate the aperture plate, and perform an additional bakeout on the system. This is your notice that we will be taking the system off line from 10 AM Monday June 20 through late afternoon June 24, 2005. PCM test and Qualification runs will be conducted that Friday afternoon 13:00 - 18:00 hours. There is the opportunity to " Share the Ride" with me during these test. Raith and myself apologize for the change in the planned downtime, but this was unavoidable. Users are encouraged to make good use of this additional time remaining to complete your work on the system before the down time commences. Thank you for your support! James W. Conway Dick Crane wrote: > Raith users: > > The column replacement work scheduled for the week of June 6 has been > delayed and is tentatively rescheduled for the week of June 20. I have > removed the maintenance reservations from the week of June 6. Please > feel free to sign up for this newly opened time. > > Thanks, > > Dick -------------- next part -------------- An HTML attachment was scrubbed... URL: From cwhicks at stanford.edu Tue Jun 7 21:16:59 2005 From: cwhicks at stanford.edu (Clifford Hicks) Date: Tue, 7 Jun 2005 21:16:59 -0700 (PDT) Subject: Raith free 6-9am tomorrow (Wed 8 Jun) Message-ID: I haven't properly prepared. From jwc at snf.stanford.edu Thu Jun 9 17:02:16 2005 From: jwc at snf.stanford.edu (James Conway) Date: Thu, 09 Jun 2005 17:02:16 -0700 Subject: I am handing off to Hungtao Chou early... Message-ID: <42A8D888.5080206@snf.stanford.edu> An HTML attachment was scrubbed... URL: From jwc at snf.stanford.edu Thu Jun 9 17:29:53 2005 From: jwc at snf.stanford.edu (James Conway) Date: Thu, 09 Jun 2005 17:29:53 -0700 Subject: Annoucement 3 : RAITH system offline 10 AM Monday June 20 through afternoon June 24. In-Reply-To: <429DD972.2070306@snf.stanford.edu> References: <429DD972.2070306@snf.stanford.edu> Message-ID: <42A8DF01.5080707@snf.stanford.edu> Greetings Raith Users: The RAITH system will be going offline to users 10 AM Monday June 20 through late afternoon Friday June 24. We may be seeking standby operators for test exposures evening and overnight on Thursday June 23, 2005; but only if we can complete raith field service test before that time. Please see James Conway if you are interested in helping us qualify the system. This is your notice that we will be taking the system off line from 10 AM Monday June 20 through late afternoon June 24, 2005. PCM test and Qualification runs will be conducted that Friday afternoon 13:00 - 18:00 hours. There is the opportunity to " Share the Ride" with me during these test. Users are encouraged to make good use of the available time remaining to complete your work on the system before the down time commences. As in the past it is sometimes challenging to bring these system back up and into order. All parties will do their very best to complete this work within the scheduled time. Thank you for your support! James W. Conway -------------- next part -------------- An HTML attachment was scrubbed... URL: From jwc at snf.stanford.edu Thu Jun 9 18:17:04 2005 From: jwc at snf.stanford.edu (James Conway) Date: Thu, 09 Jun 2005 18:17:04 -0700 Subject: JWC is out FRI. & MON: HOW to get help on the RAITH System during your session -- "Who are your gonna call" Message-ID: <42A8EA10.9090708@snf.stanford.edu> FAQ ##: SYSTEM PROBLEMS: "WHO ARE YOU GOING TO CALL" Greetings Raith Users: I will be away this Friday and next Monday attending a training event in Southern California. I will be returning 8:30 AM Tues. I wish to remind everyone that we have set into place a hierarchical structure on what to do and whom to call if you encounter problems on the RAITH 150 system during my absence, or for those times I am not be available by cell phone. I may not be available by phone during this period at 415-412-4825 because at times I will be 'off-the-grid'. Please leave a voice mail and I will respond as soon as I am able to. For Example: * You encounter a LOAD LOCK Error 5 on the system and cannot complete the Load/ Unload cycle without an administrator login. * The pumps or system hardware are not working normally and the logic may have become reversed. * Beam Blanking Logic is reversed due to an RAITH150.exe application crash when the beam was unblanked... 1. If I am available, try to call me on my cell and I will walk you through the Recovery procedures. 001-415-412-4825 (NOTE: I live on the fringe of cell service when at home, and every Monday evening am off the grid after 10 PM and cannot be reached. Sometimes I can receive a SMS text messages. I will respond if I am able to ASAP. 2. Try to contact a RAITH Champion: Luigi Scaccabarozzi gigi at snf.stanford.edu at 1-650-725-6970 GIGI will be away this weekend too! Arvind Sundaramurthy arvisun at stanford.edu 1-650- 450-0475 Ryan Tu ryantu at stanford.edu 1-650-799-6492 Mark Topinka mtopinka at stanford.edu 1-650-387-6049 David Fattal dfattal at stanford.edu 650-724-9612 office 650-723-8586 lab 3. Contact a RAITH USA Application Support Specialist: Dr. Joseph Klingfus, Applications Scientist jk at raithusa.com 218-483-1267 4. For Major Hardware issues and all emergencies with the LEO or RAITH Hardware: Contact the RAITH USA Field Service Manager, Cole Loomis cl at raithusa.com (631) 738-9500 or Kevin Burcham kb at raithusa.com also at the Main Raith USA line (631) 738-9500 Finally unless it is a catastrophic failure and the system becomes unsafe or in the least terrifying to operate -- please avoid placing the system into RED LIGHT Mode when I am away. ALWAYS report all errors and comments to to the CORAL 'Make Comments' or 'Report Problem' section so it gets logged into our tracking system. To quote John Shott, "Its not a problem until it is reported to CORAL." Many thanks to the many Raith Champions whom have come forward and offered to cover for me during my absence! Thank you all for your support! James Conway Ebeam Technology Group Stanford Nanofabrication Facility. 650-725-7075 cell 415-412-4825 jwc at snf.stanford.edu -------------- next part -------------- An HTML attachment was scrubbed... URL: From hungtao at stanford.edu Thu Jun 9 20:39:03 2005 From: hungtao at stanford.edu (Hung-Tao Chou) Date: Thu, 9 Jun 2005 20:39:03 -0700 Subject: write will finish early In-Reply-To: <42A8D888.5080206@snf.stanford.edu> References: <42A8D888.5080206@snf.stanford.edu> Message-ID: <1118374743.42a90b5766b74@webmail.stanford.edu> I started earlier and my wirte finish around 9pm. -Hungtao Quoting James Conway : > > > > > > > > I was working with another two users this afternoon, and will not have > enough time to complete my planned write on the system scheduled for > this evening before your session will begin. I desire to hand off to > you and give you some more time for your work in deference to the > delays that I have contributed to your project last month when my > writes extended into your session time. > > > > If you cannot start early just forward to the RAITH group that the > system is available. > > Good Beam current today. Voltage is stable to 20 kV. Adjustments I made > to the gun parameters Fil I ten days ago have stabilized within the > optimal range. > > > > All the best, > > > > James Conway > > > > > From ahazeghi at stanford.edu Fri Jun 10 17:37:56 2005 From: ahazeghi at stanford.edu (Arash Hazeghi) Date: Fri, 10 Jun 2005 17:37:56 -0700 Subject: Raith free Message-ID: <544cf5414042e89af2daf2a2bae3b838@stanford.edu> Raith is free, enjoy Arash From ifushman at stanford.edu Fri Jun 10 18:27:34 2005 From: ifushman at stanford.edu (Ilya Fushman) Date: Fri, 10 Jun 2005 18:27:34 -0700 Subject: won't make reservation tonight. will remove it as soon as i can References: <544cf5414042e89af2daf2a2bae3b838@stanford.edu> Message-ID: <001301c56e24$be99ddc0$0300a8c0@ilya> Sorry for the late notice. I have other pending work. ----- Original Message ----- From: "Arash Hazeghi" To: "raith" Sent: Friday, June 10, 2005 5:37 PM Subject: Raith free > Raith is free, > enjoy > Arash > From hendrikb at stanford.edu Sat Jun 11 13:51:04 2005 From: hendrikb at stanford.edu (Hendrik Bluhm) Date: Sat, 11 Jun 2005 13:51:04 -0700 (PDT) Subject: Raith free in ~30 min Message-ID: finishing early --------------------------------------------------- Hendrik Bluhm Department of Physics Stanford University Work address: Moler Lab Lab. for Advanced Materials Phone: (650) 723-4012 McCullough Bldg. Fax: (650) 725-2189 476 Lomita Mall Stanford, CA 94305 From hungtao at stanford.edu Sun Jun 12 20:21:16 2005 From: hungtao at stanford.edu (Hung-Tao Chou) Date: Sun, 12 Jun 2005 20:21:16 -0700 Subject: Raith available tomorrow 10am-2pm Message-ID: <1118632876.42acfbac2f5d2@webmail.stanford.edu> sample not ready. -Hungtao From yamanaka at snowmass.stanford.edu Mon Jun 13 23:16:41 2005 From: yamanaka at snowmass.stanford.edu (Kazuhiko Yamanaka) Date: Mon, 13 Jun 2005 23:16:41 -0700 Subject: Raith Problem: Monitor of SEM does not work. In-Reply-To: <1118632876.42acfbac2f5d2@webmail.stanford.edu> References: <1118632876.42acfbac2f5d2@webmail.stanford.edu> Message-ID: <20050613230337.62AE.YAMANAKA@snowmass.stanford.edu> Dear James and Raith users, The monitor of SEM User Interface does not work, so that I could not use Raith. My previous user noted the same problem. Best wishes, Kazuhiko From jwc at snf.stanford.edu Tue Jun 14 09:52:39 2005 From: jwc at snf.stanford.edu (James Conway) Date: Tue, 14 Jun 2005 09:52:39 -0700 Subject: [Fwd: Re: Problem raith SNF 2005-06-13 15:10:27: RAITH monitor doesn't work] Message-ID: <42AF0B57.4010707@snf.stanford.edu> An HTML attachment was scrubbed... URL: From jwc at snf.stanford.edu Tue Jun 14 09:57:38 2005 From: jwc at snf.stanford.edu (James Conway) Date: Tue, 14 Jun 2005 09:57:38 -0700 Subject: Annoucement 4 : RAITH system offline 10 AM Monday June 20 through afternoon June 24. In-Reply-To: <429DD972.2070306@snf.stanford.edu> References: <429DD972.2070306@snf.stanford.edu> Message-ID: <42AF0C82.9090106@snf.stanford.edu> An HTML attachment was scrubbed... URL: From ahazeghi at stanford.edu Thu Jun 16 15:03:51 2005 From: ahazeghi at stanford.edu (Arash Hazeghi) Date: Thu, 16 Jun 2005 15:03:51 -0700 Subject: Reservation removed Message-ID: <0c76cb88407c036736d9f35ed2d354a0@stanford.edu> Reservation removed tonight, sample not ready. From zia at stanford.edu Fri Jun 17 10:55:08 2005 From: zia at stanford.edu (Rashid Zia) Date: Fri, 17 Jun 2005 10:55:08 -0700 Subject: Raith Free, 3:30am-8am Friday night / Satruday Morning In-Reply-To: <0c76cb88407c036736d9f35ed2d354a0@stanford.edu> Message-ID: <200506171755.j5HHt0no028132@smtp-roam.Stanford.EDU> Sorry, but I won't be able to use this prime slot tonight. The Raith is free from 3:30am to 8am early Saturday morning (Friday night). Cheers, Rashid. From jiencao at stanford.edu Sun Jun 19 12:16:21 2005 From: jiencao at stanford.edu (Jien Cao) Date: Sun, 19 Jun 2005 12:16:21 -0700 Subject: raith free 4:30-8pm Message-ID: <000701c57503$60d4d600$0100000a@chochobo> Sorry for the late notice. From ryantu at stanford.edu Sun Jun 19 12:23:39 2005 From: ryantu at stanford.edu (Ryan Tu) Date: Sun, 19 Jun 2005 12:23:39 -0700 Subject: raith free 4:30-8pm In-Reply-To: <000701c57503$60d4d600$0100000a@chochobo> References: <000701c57503$60d4d600$0100000a@chochobo> Message-ID: <1119209019.42b5c63beda2b@webmail.stanford.edu> I'll take it from 4:30 - 6:00 Thanks, Ryan Quoting Jien Cao : > Sorry for the late notice. > From jhemanth at stanford.edu Sun Jun 19 13:14:57 2005 From: jhemanth at stanford.edu (Hemanth Jagannathan) Date: Sun, 19 Jun 2005 13:14:57 -0700 Subject: raith free 4:30-8pm In-Reply-To: <1119209019.42b5c63beda2b@webmail.stanford.edu> Message-ID: <000501c5750b$940d0b20$0100000a@JAGANNATHANPC> I'll take it from 6-8pm Hemanth Jagannathan From jwc at snf.stanford.edu Fri Jun 24 18:31:54 2005 From: jwc at snf.stanford.edu (James Conway) Date: Fri, 24 Jun 2005 18:31:54 -0700 Subject: NEW LEO SEM COLUMN installed and system qualified, now back on-line. Users restricted to 10 kv through July 6, 2005 Message-ID: <42BCB40A.2040102@snf.stanford.edu> Greetings Raith Community: This week we received installed and characterized a brand new LEO 1530 SEM column on the RAITH 150 system. Tuesday evening, working into the early morning with Jason Sanabia and Mirwais Aktary, we exchanged the SEM column on the Raith 150 system with a new SEM column. Through the remainder of the week we have been performing many test and qualification evaluation runs. I am very much relieved to report that the blanker leakage and column scattering issues that we have experienced since mid May of last year have now been fully resolved to my satisfaction. Emission and scatter from the column when blanked on the Raith Blanker are now between 0.0002 and 0.0003 nA for all apertures. There is no difference between this value when the LEO blanker is enabled either. A test script that we have been employing to evaluate scatter for various impingement periods, which well displayed the problem before we installed the new column, also displayed no exposure artifacts evident whatsoever after the column exchange. Please READ: WE NOW HAVE BASICALLY A BRAND NEW AND CALIBRATED RAITH 150 SYSTEM. THE SEM COLUMN, IN-LENS DETECTOR, THE FE-GUN, AND THE BLANKER SECTIONS ARE BRAND SPANKING NEW! THE SYSTEM AND COLUMN ARE EXQUISITELY CLEAN AND FREE OF CONTAMINATION -- WE MUST ALL STRIVE TO DILIGENTLY KEEP IT THIS WAY. ALL USERS MUST COMPLY WITH THE FOLLOWING PROTOCOLS EXACTLY WITH NO EXCEPTIONS: 1. NO OPERATIONS ABOVE 10 kV ACCELERATION VOLTAGE WHILE WE CONDITION THE FE-GUN.( through 7-6-1005) 2. NO RESIST OR OTHER MATERIALS THAN HAVE NOT BEEN SOFT BAKED TO > 150 DEGREES C. 3. BEFORE GOING INTO THE LOAD LOCK ON THE SYSTEM ALL CHIPS AND WAFERS MUST BE SOFT BAKED AGAIN AT >= 90 DEGREES CELSIUS FOR 90 SECONDS. REMARKABLE YOU WILL OBTAIN BETTER CONTAMINATION DOTS TOO! 4. NO CARBON TAPE, EPOXIES, GREASES, OR OTHER ADHESIVES ARE TO BE PLACED INTO THE SYSTEM OTHER THAN MINUTE FRAGMENTS OF SPECTRA TABS THIN CONTAMINATION FREE CARBON DOTS. SMALL 1 MM STRIPES ARE RECOMMENDED. ALL OTHER HOLD DOWN FIXTURES MUST BE FRESHLY SOLVENT CLEANED AND BAKED BEFORE ENTERING SYSTEM. IF YOU ARE UNABLE TO FOLLOW THESE GUIDELINES EXACTLY TAKE YOUR WORK ELSEWHERE! Should you have any questions please see during my office hour! Finally everyone working on the Stanford RAITH system owes a great debt of gratitude to the following people for making the extra effort and going the distance to resolve this problem. Any other manufacturer would have not gone to this level of effort that the RAITH team has made to address our concerns, and to ensure that we had the very best system possible to perform our research here at SNF! Special recognition goes out to: George Lanzarotta gl at raithusa.com President RAITH USA -- This replacement is likely costing him in excess of $50 K US. Ralf Jede Director RAITH GmbH for his continuing concern and support through this period. He freed up the personnel resources necessary to successfully complete the task from the RAITH Dortmund site side. Bernd Stegemann, Stegemann at Raith.de RAITH GmbH, Dortmund. For time and travel well above reasonable expectations. His outstanding talent and effort made both here at Stanford and at Raith in Dortmund, DE and working in Oberkocken at the Zeiss factory ensured we obtained the very best column set up possible. Michael Kahl kahl at raith.de for his continuing technical and application support. We worked well into the night during my visit to Dortmund, DE in April and we made critical observations comparing several RAITH systems that gave us the right directions to proceed IN to address the scattering issues. Cole Loomis RAITH USA Field Service Manager We must have had 100 hours on the phone CALLS nights and mornings during measurements over the last year. Jason Sanabia and Mirwais Aktary RAITH USA Field Service for time and effort above and beyond any reasonable expectation. The three of us have been at it since the minute they arrived here at SNF this week and we completed the plan on time and with an successful outcome. These guys are "The Right Stuff." Mike Santomango Zeiss SMT Field Service. Despite other commitments from Zeiss, he did his absolute best and made sure that when we needed him he was there and was able to get the adjustments performed that needed to be performed, and for his continuing support. He is one of Zeiss's very best technical people. Dan Pickard, Pease Group Stanford. For continuing consultation and support related to electro-static and SEM Column Theory in discussions that were useful and informative toward reaching a solution. There were many other people involved in this work over the last year from both RAITH organizations, Zeiss SMT, and Stanford. Please accept my heartfelt thanks for your encouragement and support through the past year. Many many thanks to you all. Now lets get back to our research and together let us push the limits of Ebeam Lithography here at Stanford Nanofabrication Facility. Sincerely Yours, James Conway Ebeam Technology Group Stanford Nanofabrication Facility -------- Original Message -------- Subject: Problem raith SNF 2005-06-24 13:36:06: Users restricted to 10 kv through July 6, 2005 Date: Fri, 24 Jun 2005 13:36:07 -0700 From: jwc at snf.stanford.edu To: raith-pcs at snf.stanford.edu No operations above 10 kV -- the system was tested hot to 20 kV and cold to 30 kV but we wish to allow additional time for FE-Gun tip conditions to stabilize and vacuum to enter the 10e--010 mbar range. I will qualify the system for higher acceleration voltages on July 5, 2005 James Conway 06242005:13:34:00.00 -------------- next part -------------- An HTML attachment was scrubbed... URL: From jwc at snf.stanford.edu Mon Jun 27 11:47:38 2005 From: jwc at snf.stanford.edu (James Conway) Date: Mon, 27 Jun 2005 11:47:38 -0700 Subject: ANNOUNCEMENT: Take a spin with me Ebeam resist training on the headway spinner. Tuesday 10 am - 1 PM. Message-ID: <42C049CA.6030806@snf.stanford.edu> Greetings RAITH Group XIV and other interested people: Please come and 'Take a Spin with Me.' I will be conducting Ebeam Resist Handling on the Headway Spinner working with several polymers and you can use this opportunity to clean and coat your wafers for your work too! I will be starting with wafer cleans for clean level Silicon and stripping old resist as well on WBNONMETAL starting at 10 AM then starting coating operations from 11 - 12:30. I have reserved the headway from 11 - 1:00 PM for your usage. No need to reply to this email -- just show up and learn and get qualified on this very useful tool. Thank you, james Conway -------------- next part -------------- An HTML attachment was scrubbed... URL: From jwc at snf.stanford.edu Mon Jun 27 17:24:27 2005 From: jwc at snf.stanford.edu (James Conway) Date: Mon, 27 Jun 2005 17:24:27 -0700 Subject: [Fwd: Comment raith SNF 2005-06-27 17:16:45: USERS ARE RESTRICTED TO BELOW 20 KV OPERATIONS.] Message-ID: <42C098BB.1070509@snf.stanford.edu> An HTML attachment was scrubbed... URL: From jwc at snf.stanford.edu Mon Jun 27 17:52:27 2005 From: jwc at snf.stanford.edu (James Conway) Date: Mon, 27 Jun 2005 17:52:27 -0700 Subject: [Fwd: Raith Micrograph Award 2005] Message-ID: <42C09F4B.5020006@snf.stanford.edu> An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: raith_micrograph_award_2005.pdf Type: application/octet-stream Size: 1168145 bytes Desc: not available URL: From zia at stanford.edu Mon Jun 27 18:26:07 2005 From: zia at stanford.edu (Rashid Zia) Date: Mon, 27 Jun 2005 18:26:07 -0700 Subject: Raith free tomorrow, 9am-1pm Message-ID: <200506280125.j5S1PsNN000901@smtp-roam.Stanford.EDU> Hi everyone, I have canceled my reservation from 9am - 1pm tomorrow (Tuesday). Sorry for the late notice, but I can not use my time tomorrow morning. Apologies, Rashid. -------------- next part -------------- An HTML attachment was scrubbed... URL: From jwc at snf.stanford.edu Wed Jun 29 12:11:06 2005 From: jwc at snf.stanford.edu (James Conway) Date: Wed, 29 Jun 2005 12:11:06 -0700 Subject: ANNOUNCEMENT: Please welcome RAITH Group XIV to the Raith community. Message-ID: <42C2F24A.504@snf.stanford.edu> Greetings Raith Community: Please welcome the next six users from RAITH Group XIV into the RAITH Community! These individuals worked very hard with me attending both the Four Day Short Course and several additional user sessions and everyone did a fine job of coming up to speed as Basic Operators on the RAITH 150 system. Please work with them and promote the concept of "Sharing the Ride" on your runs while working on the system. This will help us to reduce the load lock sample exchange time overhead and enable more people to complete their work on the RAITH 150. Thank you for your support! James Conway SNF <>Raith Group XIV: 1. Serena Faruque serenaf at stanford.edu Coral: serenaf Peter Peumans Group, Electrical Engineering Project: Nanowires placed into circuits for nano-electronics. 2. SangBum Kim kimsangb at stanford.edu Coral: kimsangb H.S. Philip Wong Group Project: nonvolatile memory devices <>3. Sun-Hae Hong shhong at stanford.edu Coral: shhong Yamamoto Group Project: Quantum Dots for Quantum Information Devices. 4. Jun Pan panjun at stanford.edu Coral: panjun Jim Harris Group Project: Stopping Light using a Photonic Crystal 5. Xinran Wang xinranw at gmail.com Coral: xinranw Dai Group: nano-scale Carbon nanotubes and nano-wires (Ge) 6. Yuerui Lu yueruilu at stanford.edu Coral: lorry Dai group: Carbon Nanotube synthesis Everyone Gained Qualification on June 28, 2005 -------------- next part -------------- An HTML attachment was scrubbed... URL: From jiencao at stanford.edu Wed Jun 29 21:03:13 2005 From: jiencao at stanford.edu (Jien Cao) Date: Wed, 29 Jun 2005 21:03:13 -0700 Subject: finished early Message-ID: <1120104193.42c36f0150621@webmail.stanford.edu> Was able to start early, system availible through 10PM. From ifushman at stanford.edu Wed Jun 29 22:46:59 2005 From: ifushman at stanford.edu (Ilya Fushman) Date: Wed, 29 Jun 2005 22:46:59 -0700 Subject: no image Message-ID: <1120110419.42c387536ed3a@webmail.stanford.edu> I am not able to image with the system even after resetting and restarting everything. Cancelling reservation. -Ilya