JWC finished earlier than expected -- system is now available.

James Conway jwc at snf.stanford.edu
Wed Nov 1 17:55:01 PST 2006


JWC finished earlier than expected -- RAITH 150 system is now available.

Ran the system with no problems and a very tight beam spot at 20 kV for 
the entire afternoon.


Please be careful on the Load Lock procedures this evening...

Best,

JWC





More information about the raith mailing list