RAith Session Today
James Conway
jwc at snf.stanford.edu
Fri Sep 15 13:25:00 PDT 2006
Great -- that will leave time for my exposure to complete. I was
running a bit late too as I bit off more than I could complete within
the time allowed.
Thank you,
JWC
Hemanth Jagannathan wrote:
> HI James,
>
> Thanks for the mail earlier today. I am running a bit late on my
> samples and will start my e-beam session at 2:30pm today.
>
> Regards,
>
> Hemanth
>
>
>
> ********************************************************
>
> Hemanth Jagannathan
> PhD Candidate
> Department of Electrical Engineering
> Stanford University, CA
> Phone :(O)(650)-725-0417; (C) (650)-380-2105
> e-mail: jhemanth at stanford.edu <mailto:jhemanth at stanford.edu>
>
> ********************************************************
>
> -----Original Message-----
> From: James Conway [mailto:jwc at snf.stanford.edu]
> Sent: Friday, September 15, 2006 1:10 PM
> To: Raith SNF Mailing list
> Cc: Cole Loomis -- RAITH USA.; Joseph Klingfus
> Subject: Comment raith SNF 2006-09-15 10:25:03: 120 um Gun
> alignment out of specification.
>
> I have called Raith USA Inc. and asked them to put in a service
> request with Zeiss SMT.
> I have a reservation next Friday on CORAL to perform this routine
> and to check other items on the system as well.
>
> Thank you for your support!
>
> James Conway
>
>
> -------- Original Message --------
> Subject: Comment raith SNF 2006-09-15 10:25:03: 120 um Gun
> alignment out of specification.
> Date: Fri, 15 Sep 2006 10:25:04 -0700
> From: jwc at snf.stanford.edu
> To: raith-pcs at snf.stanford.edu
>
>
>
>Good Morning,
>User Topinka and DGG group reported that the 120 um Gun alignment settings were approaching the limits of the adjustment range.
>Today I checked this out and determined that we may need to perform a mechanical gun realignment before we can properly align the 120 um aperture Gun alignment setting properly.
>This may or may not have been resultant from last week's Power drop to the system -- but likely just a normal consequence of running in the FE-GUN.
>(Current time on FE Gun -s 1537 hours emission time.)
>
>Note: After the recent FE_GUN tip exchange ZEISS Field Service DID NOT return to complete the final aperture and gun alignments. The was no further response to our request at that time. 2 phone calls were left unanswered. I called RAITH USA today and requested they schedule a service visit for us on next Friday to perform adjustments and update the system settings. (Joel at RAITH USA Inc.)
>
>Best,
>
>James Conway
>
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/raith/attachments/20060915/862e41e9/attachment.html>
More information about the raith
mailing list