RAith Session Today

James Conway jwc at snf.stanford.edu
Fri Sep 15 13:25:00 PDT 2006


Great -- that will leave time for my exposure to complete.  I was 
running a bit late too as I bit off more than I could complete within 
the time allowed.
Thank you,

JWC


Hemanth Jagannathan wrote:

> HI James,
>  
>     Thanks for the mail earlier today. I am running a bit late on my 
> samples and will start my e-beam session at 2:30pm today.
>  
> Regards,
>  
> Hemanth
>  
>  
>
> ********************************************************
>
> Hemanth Jagannathan
> PhD Candidate
> Department of Electrical Engineering
> Stanford University, CA
> Phone :(O)(650)-725-0417; (C) (650)-380-2105
> e-mail: jhemanth at stanford.edu <mailto:jhemanth at stanford.edu>
>
> ********************************************************
>
>     -----Original Message-----
>     From: James Conway [mailto:jwc at snf.stanford.edu]
>     Sent: Friday, September 15, 2006 1:10 PM
>     To: Raith SNF Mailing list
>     Cc: Cole Loomis -- RAITH USA.; Joseph Klingfus
>     Subject: Comment raith SNF 2006-09-15 10:25:03: 120 um Gun
>     alignment out of specification.
>
>     I have called Raith USA Inc. and asked them to put in a service
>     request with Zeiss SMT.
>     I have a reservation next Friday on CORAL to perform this routine
>     and to check other items on the system as well.
>
>     Thank you for your support!
>
>     James Conway
>
>
>     -------- Original Message --------
>     Subject: 	Comment raith SNF 2006-09-15 10:25:03: 120 um Gun
>     alignment out of specification.
>     Date: 	Fri, 15 Sep 2006 10:25:04 -0700
>     From: 	jwc at snf.stanford.edu
>     To: 	raith-pcs at snf.stanford.edu
>
>
>
>Good Morning,
>User Topinka and DGG group reported that the 120 um Gun alignment settings were approaching the limits of the adjustment range.
>Today I checked this out and determined that we may need to perform a mechanical gun realignment before we can properly align the 120 um aperture Gun alignment setting properly.
>This may or may not have been resultant from last week's Power drop to the system -- but likely just a normal consequence of running in the FE-GUN.
>(Current time on FE Gun -s 1537 hours emission time.)
>
>Note: After the recent FE_GUN tip exchange ZEISS Field Service DID NOT return to complete the final aperture and gun alignments.  The was no further response to our request at that time.  2 phone calls were left unanswered.  I called RAITH USA today and requested they schedule a service visit for us on next Friday to perform adjustments and update the system settings. (Joel at RAITH USA Inc.)
>
>Best,
>
>James Conway
>
>    
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/raith/attachments/20060915/862e41e9/attachment.html>


More information about the raith mailing list