Raith Status 13:00 04-05-2007 -- SYSTEM is up and coming on line for users late this afternoon
James Conway
jwc at snf.stanford.edu
Thu Apr 5 13:18:19 PDT 2007
Good Afternoon,
Repairs to the cooling loop to the Neslab chiller have been completed
and this problem is resolved.
I started pumping on the system early this morning and I was able to
start up the FE-Gun up at 10:30 AM. The system faulted in my attempt to
startup the pumps late last night, possibly from the water flow/temp
alarm that tripped before.
This afternoon, I will be making some measurements and qualifying the
tool for operation. We will also be doing an additional exposure with
Tomas Sikola starting about 1:30 PM today. Users whom have not yet
qualified on the new RAITH 150 version 4 may desire to make appointments
with me for next week to review the changes in the operation procedures.
Users can expect to resume the CORAL schedule queue from 17:00 today.
*
Users restricted to no higher than 10 keV acceleration voltage through
early next week.*
More as it happens,
James Conway
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/raith/attachments/20070405/cc0125a1/attachment.html>
More information about the raith
mailing list