jim haydon will fix the broken electrical connector wednesday morning.
jim and j will reassmble the savannah manifold on wednesday. then following will occur:
base pressure check
heater check
bake out
ald line/valve integrity check
process qual
when all of the above pass, the machine will be returned to users.