From gsosa at snf.stanford.edu Thu Jun 21 08:15:27 2012 From: gsosa at snf.stanford.edu (gsosa at snf.stanford.edu) Date: Thu, 21 Jun 2012 08:15:27 -0700 Subject: Comment stresstest SNF 2012-06-21 08:15:26: Update 6/21 Message-ID: Vendor is being scheduled in to verify system calibrations. From gsosa at snf.stanford.edu Mon Jun 25 07:14:37 2012 From: gsosa at snf.stanford.edu (gsosa at snf.stanford.edu) Date: Mon, 25 Jun 2012 07:14:37 -0700 Subject: Comment stresstest SNF 2012-06-25 07:14:36: Update 6/25 Message-ID: Vendor came in on 6/22 and checked out system calibrations. Measurements before calibrations/adjustments with standard wafer set were within specification. Vandor made adjustments with tooling. Measurements after adjustment were also within specification.