Comment sts SNF 2008-09-26 07:36:46: new pump installation Thursday Oct 2

jperez at jperez at
Thu Oct 2 14:18:41 PDT 2008

New pump installed, system needs to be cleaned (7 steps).
Power was turned off. An oxide and / or nitride test needs  to
be ran before system is back up for processing.

More information about the sts-pcs mailing list