From flannery at stanford.edu Thu Dec 7 05:37:28 2000 From: flannery at stanford.edu (Anthony Flannery) Date: Thu, 07 Dec 2000 05:37:28 -0800 Subject: Back to normal Message-ID: <3A2F9298.7199AC38@stanford.edu> Hey Gang, I will be starting the etchback process on carbide today and switching the gases back to normal. The carbide etchback is a 6 hour process so the system would be ready for a wipedown and clean later this evening (Thursday 12/6). I would continue with the cleaning but I am leaving town for a couple of days so if you want to use it before I get back, you'll have to take over from the first wipedown. IF THE CHAMBER LOOKS A LITTLE DIRTY - RUN ETCHBACK3 AGAIN! Look especially on the roof of the chamber (use a blank wafer as a mirror). If you see dark streaks, it's not clean. Do the wipe and then run another clean. Also, I looked back through the logbooks. ALmost all of you are forgetting to include the thickness of the pre-deps in your running count on the thickness. The chamber starts with 1.25 um - ALWAYS. There should not be any log entries less than this. The thickest deposition is 3.25 um - NOT 4.5 um. Thanks for keeping this straight. Thanks for all your patience. I'll be doing this once more before Christmas shutdown, so if anyone's got a time critical run before that, e-mail me and we will coordinate. Once I start, it's really prohibitive to switch back and the standard processes are not compatible. I'll work around you, but you have to let me know in advance. Thanks again, Tony