Shutdown stsetch 2002-02-13 15:10:03: venting problem
cbaxter at snf.stanford.edu
cbaxter at snf.stanford.edu
Wed Feb 13 05:20:26 PST 2002
installed two ground wires. one on the top cover and the
second one on the side cover. system is ready
More information about the stsetch-pcs
mailing list