Shutdown stsetch 2002-03-21 07:26:41: communications failure

booth at booth at
Thu Mar 21 12:05:32 PST 2002

worked with Mike from STS to change cabling
so that Application software does not need to
communicate with the ion guage controller.
Removed Ion Guage controller & guage head
from system, & verified normal operation.

More information about the stsetch-pcs mailing list