From cbaxter at snf.stanford.edu Wed Aug 9 17:06:55 2006 From: cbaxter at snf.stanford.edu (cbaxter at snf.stanford.edu) Date: Wed, 9 Aug 2006 17:06:55 -0700 Subject: Comment stsetch SNF 2006-08-09 17:06:54: update. Message-ID: The f/s rep changed the back up battery, the original two battery only put out 11 and 7 vdc. The tool still have the same problem even after back up battery changed, the llc still not communicating. The rep left @11.15am and has not come back . From cbaxter at snf.stanford.edu Thu Aug 17 17:55:15 2006 From: cbaxter at snf.stanford.edu (cbaxter at snf.stanford.edu) Date: Thu, 17 Aug 2006 17:55:15 -0700 Subject: Comment stsetch SNF 2006-08-17 17:55:10: Update 8/17/06 Message-ID: Update: The LLC module is booting up and communicating but, no pnumatic control at all load lock will not vent or pump down. Larry (field service) at this point is lose.