When I loaded my wafer, the loadlock refused to pumpdown low enough in pressure to start my process.; there appear to be some adhesive on the o-ring. I got a "pump out time exceeded error", and there doesn't seem to be any way I can clear it. It may have to wait until tomorrow for Elmer.