Shutdown svgcoat SNF 2008-06-19 10:54:25: EBR splash

gsosa at gsosa at
Thu Jun 19 15:45:49 PDT 2008

Checked and adjusted nozzle angle( resist and EBR). Checked and adjusted dispense arm position and nozzle center positions. Checked and adjusted EBR position at 5mm, verified 2mm width- both OK. Checked and adjusted canister pressure to 6 PSI. Checked and decreased the EBR flow with the micrometer adjustment. All looks good. 

More information about the svgcoat-pcs mailing list