Comment svgcoat SNF 2011-03-02 10:15:30: Track Status 3/2

gsosa at snf.stanford.edu gsosa at snf.stanford.edu
Wed Mar 2 10:15:31 PST 2011


The solvent exhaust system was repaired by facilities maintenance. Static pressure and flow returned to normal levels. Re-adjusted coater bowl exhaust flow back to normal level. Checked 1.0 micron 3612 coating. All looks good. Front and backside EBR look good.
     Mean: 10072 A
     Std Dev: 8 A




More information about the svgcoat-pcs mailing list