Comment svgcoat2 SNF 2011-03-02 10:14:08: Tool Status 3/2

gsosa at gsosa at
Wed Mar 2 10:14:08 PST 2011

The solvent exhaust system was repaired by facilities maintenance. Static pressure and flow returned to normal levels. Re-adjusted coater bowl exhaust flow back to normal level. Checked 1.0 micron 3612 coating. All looks good. Front and backside EBR look good.
     Mean: 10191 A
     Std Dev: 18 A

More information about the svgcoat2-pcs mailing list