Comment svgdev2 SNF 2007-04-12 15:32:20: Weekly PM Completed

gsosa at gsosa at
Thu Apr 12 15:32:21 PDT 2007

Weekly PM Completed.
1. Adjusted air ring gap(decreased gap to < 1/16")
2. Adjusted angular position of backside nozzle
3.Increased spindle delay time to .2 seconds for repeatable      wafer loading.

More information about the svgdev2-pcs mailing list