From gth at snf.stanford.edu Wed Jul 7 21:24:17 2010 From: gth at snf.stanford.edu (gth at snf.stanford.edu) Date: Wed, 7 Jul 2010 21:24:17 -0700 Subject: Shutdown tel SNF 2010-07-07 21:24:16: MW failed, DRP stopped, LL vented. Message-ID: Please re-start. Not sure what happened ! From tberg at snf.stanford.edu Thu Jul 8 06:39:09 2010 From: tberg at snf.stanford.edu (tberg at snf.stanford.edu) Date: Thu, 8 Jul 2010 06:39:09 -0700 Subject: Shutdown tel SNF 2010-07-07 21:24:16: MW failed, DRP stopped, LL vented. Message-ID: Restarted all mech pumps, turbo,MW power supply system back in auto-possible house cooling water issue?? From tberg at snf.stanford.edu Thu Jul 29 13:39:19 2010 From: tberg at snf.stanford.edu (tberg at snf.stanford.edu) Date: Thu, 29 Jul 2010 13:39:19 -0700 Subject: Comment tel SNF 2010-07-29 13:39:18: Restarted after power out Message-ID: Restarted after power out heater should be at 400 now From gth at snf.stanford.edu Fri Jul 30 19:29:53 2010 From: gth at snf.stanford.edu (gth at snf.stanford.edu) Date: Fri, 30 Jul 2010 19:29:53 -0700 Subject: Problem tel SNF 2010-07-30 19:29:52: no process gases. Message-ID: We had a power outage in SNF. When the power came back on, The TEL machine software and pumps and MW looked OK on the computer. It gave message 176 : MAcro V-transfer impossible. Then I homed the robot and restarted the computer. But when I begin processing the recipe, the loading is fine - however the recipe fails. It is checking for the pressure in the PM1, and gases do not flow. The first step is Ar gas flow with Process pressure of 0. It gave a message 178: Macro PM1 Recipe impossible. I checked the Instruction Manual It said Description - PM1 does not respond within 60 seconds Check - Macro Routine Step No (DM11), and confirm the conditions of the step. From gth at snf.stanford.edu Fri Jul 30 20:52:54 2010 From: gth at snf.stanford.edu (gth at snf.stanford.edu) Date: Fri, 30 Jul 2010 20:52:54 -0700 Subject: Shutdown tel SNF 2010-07-30 20:52:53: read previous report. Message-ID: