min pump down pressure: 22.4mTorr (good) leak check pressure: 55mTorr (higher than usual) deposition pressure: 1300mTorr (typical, checked at begining of run) gas flows all at set point TEOS 75% full dep rate: 22-24 A/min typical: 35-40 A/min