From tberg at snf.stanford.edu Fri Apr 9 07:19:43 2010 From: tberg at snf.stanford.edu (tberg at snf.stanford.edu) Date: Fri, 9 Apr 2010 07:19:43 -0700 Subject: Shutdown teos2 SNF 2010-04-09 07:19:43: canister is MT Message-ID: canister is MT From seymour at snf.stanford.edu Fri Apr 9 08:42:55 2010 From: seymour at snf.stanford.edu (seymour at snf.stanford.edu) Date: Fri, 9 Apr 2010 08:42:55 -0700 Subject: Comment teos2 SNF 2010-04-09 08:42:55: TEOS changed Message-ID: After it reaches temp setpoint it will need a test. From seymour at snf.stanford.edu Fri Apr 9 10:48:51 2010 From: seymour at snf.stanford.edu (seymour at snf.stanford.edu) Date: Fri, 9 Apr 2010 10:48:51 -0700 Subject: Problem teos2 SNF 2010-04-09 10:48:50: base pressure high Message-ID: rate of rise is very high. Tube is leaking. From seymour at snf.stanford.edu Mon Apr 12 14:30:55 2010 From: seymour at snf.stanford.edu (seymour at snf.stanford.edu) Date: Mon, 12 Apr 2010 14:30:55 -0700 Subject: Shutdown teos2 SNF 2010-04-09 07:19:43: canister is MT Message-ID: TEOS canister changed From seymour at snf.stanford.edu Mon Apr 12 14:31:59 2010 From: seymour at snf.stanford.edu (seymour at snf.stanford.edu) Date: Mon, 12 Apr 2010 14:31:59 -0700 Subject: Problem teos2 SNF 2010-04-09 10:48:50: base pressure high Message-ID: Base pressure and rate of rise good. I flowed TEOS and it controlled at setpoint. needs test after change. From seymour at snf.stanford.edu Mon Apr 12 14:32:21 2010 From: seymour at snf.stanford.edu (seymour at snf.stanford.edu) Date: Mon, 12 Apr 2010 14:32:21 -0700 Subject: Problem teos2 SNF 2010-04-12 14:32:20: Needs test after canister change Message-ID: From maurice at snf.stanford.edu Fri Apr 16 11:07:43 2010 From: maurice at snf.stanford.edu (maurice at snf.stanford.edu) Date: Fri, 16 Apr 2010 11:07:43 -0700 Subject: Shutdown teos2 SNF 2010-04-16 11:07:42: test after canister change Message-ID: From maurice at snf.stanford.edu Fri Apr 16 11:47:39 2010 From: maurice at snf.stanford.edu (maurice at snf.stanford.edu) Date: Fri, 16 Apr 2010 11:47:39 -0700 Subject: Comment teos2 SNF 2010-04-16 11:47:38: replaced dummies Message-ID: From maurice at snf.stanford.edu Fri Apr 16 14:48:30 2010 From: maurice at snf.stanford.edu (maurice at snf.stanford.edu) Date: Fri, 16 Apr 2010 14:48:30 -0700 Subject: Shutdown teos2 SNF 2010-04-16 11:07:42: test after canister change Message-ID: ran TEOS2STD expected 980 ang Got 920 good stuff From maurice at snf.stanford.edu Fri Apr 16 14:48:45 2010 From: maurice at snf.stanford.edu (maurice at snf.stanford.edu) Date: Fri, 16 Apr 2010 14:48:45 -0700 Subject: Problem teos2 SNF 2010-04-12 14:32:20: Needs test after canister change Message-ID: test complete From ksaruta at snf.stanford.edu Thu Apr 22 15:09:54 2010 From: ksaruta at snf.stanford.edu (ksaruta at snf.stanford.edu) Date: Thu, 22 Apr 2010 15:09:54 -0700 Subject: Problem teos2 SNF 2010-04-22 15:09:54: leak pressure failed Message-ID: From seymour at snf.stanford.edu Fri Apr 23 07:41:56 2010 From: seymour at snf.stanford.edu (seymour at snf.stanford.edu) Date: Fri, 23 Apr 2010 07:41:56 -0700 Subject: Problem teos2 SNF 2010-04-22 15:09:54: leak pressure failed Message-ID: checked base and ROR last night and base was 18 mT, ROR was aboutt 46-48. Let pump overnight with N2 and today base was 18 mT and ROR was 22 mT/min. tube may have been left open long enough to get moisture in the trap.