Shutdown teos2 SNF 2010-05-06 01:54:00: Pressure not steady during dep

seymour at seymour at
Thu May 6 09:56:48 PDT 2010

baked out the pump line trap. base pressure and ROR are good. Process pressure with 500 SCCM N2 was 440 mT. System looks good. needs a test