Shutdown teos2 SNF 2011-04-19 00:06:51: deposition aborted due to pressure failure
srikantv at snf.stanford.edu
srikantv at snf.stanford.edu
Tue Apr 19 00:06:51 PDT 2011
I tried to run TEOS2STD twice.
Both times the pressure increased from 1200 mtorr to 1900+ mtorr within 10 minutes of deposition starting (step 70) and then aborted
More information about the teos2-pcs
mailing list