Problem teos2 SNF 2011-05-05 14:38:34: Fail Leak check and pressure rising
wangss at snf.stanford.edu
wangss at snf.stanford.edu
Thu May 5 14:38:35 PDT 2011
Had two runs. First run passed leak check, but noticed a very high pressure (1900) during depostion step. Second run failed leak check. Aborted the process and put the tube in pump program.
More information about the teos2-pcs
mailing list