From maurice at stanford.edu Fri Jun 15 17:24:18 2007 From: maurice at stanford.edu (maurice stevens) Date: Fri, 15 Jun 2007 17:24:18 -0700 Subject: 3 hr Deposition ran ok Message-ID: <46732DB2.7040906@stanford.edu> We ran 3 hour Teos dep (thanks Mike and Ted). Pressure and Teos flow ok during entire run. -- maurice at stanford.edu Maurice Stevens Stanford Nanofabrication Facility CIS Room 142, Mail Code 4070 Stanford, CA 94305 P. (650)725-3660 F. (650)725.6278 From maurice at stanford.edu Thu Jun 28 09:50:08 2007 From: maurice at stanford.edu (maurice stevens) Date: Thu, 28 Jun 2007 09:50:08 -0700 Subject: Teos2 yellow lighted/gas flow control issue Message-ID: <4683E6C0.3090501@stanford.edu> System will be yellow lighted. The teos flow controller flows the correct value during deposition. But it falsely displays a flow when out of the deposition step. A new teos MFC has been ordered...it should arrave in 4 weeks. Speak with Ted or Maurice before using . We want to make sure you understand the issue. -- maurice at stanford.edu Maurice Stevens Stanford Nanofabrication Facility CIS Room 142, Mail Code 4070 Stanford, CA 94305 P. (650)725-3660 F. (650)725.6278