Shutdown thermcopoly1 SNF 2008-06-16 20:24:51: Fails leak check

seymour at snf.stanford.edu seymour at snf.stanford.edu
Thu Jun 19 12:04:40 PDT 2008


replaced oring on T/C sheath and on both ends of loader bellows. Polished loader bellows flanges. Tube pumped down to 14 mT and leak rate was good at 41/min. 