Shutdown thermcopoly1 SNF 2010-02-23 08:35:34: hi base pressure
seymour at snf.stanford.edu
seymour at snf.stanford.edu
Tue Mar 2 14:03:14 PST 2010
removed and replaced t/c sheath. tube bases to 10 mT and ROR was 13 mT/min. needs test after repair.
More information about the thermcopoly1-pcs
mailing list