Shutdown tylan2 2001-01-27 16:29:04: Back up for production!
jgarate at snf.stanford.edu
jgarate at snf.stanford.edu
Mon Jan 29 09:53:17 PST 2001
Previous message:
Shutdown tylan2 2001-01-27 16:29:04: right side of back baffle was dragging along tube and was pushing the boats to the front. boats were put in orange dry box